I know it is an old thread, but been researching for a few weeks. My partner already purchased this and I am looking at it. Anyone have anything new to add?
If any of the below sounds foreign or unfamiliar. STOP and RESEARCH more, you are not ready.
Run cycle support 2 weeks before, during and into pct. 2 tubs of the orange will suffice. Found here-
Invalid Link Removed
I highly recommend a VERY strong post cycle therapy program. This triple compound will cause major shutdown. An 8 week PCT therapy program is mandatory, IMO.
SERM Cycle for 6 weeks running into some type of very good natty test stack starting week 5 of pct.
I would run something like this.
Methyl V- 2 caps- split AM and PM, as close as possible to 12 hours apart.
Cycle Support- Label directions
Tons of Food, 2 gallons of water ED, Limit stimulants and salt(Blood pressure will rise)
EFA's
Protein, Again, Tons of water
FOOD, SLEEP and TRAINING
Day after last dose of Methyl V.
Clomid
Weeks 1-4 50mg ED
Weeks 5-6 25mg EOD
Ldex
Weeks 3-4 .25mg ED
Weeks 5-6 .25mg EOD
SMS Vers. 2.0
Weeks 5-8
Label Directions of ALL bottles.
This will give you a very solid 8 weeks of pct to recover from this VERY POTENT stack. Methyl V will yield gains of 20 pounds in 4 weeks without a blink, if nutrition and lifting is on target.
Remember. Methyl V- Test is Superdrol, Phera- Plex and Tren. ALL IN ONE. Plan and prepare for it, or suffer the consequences. SRS.
SMS Vers. 2.0