Guest viewing limit reached
  • You have reached the maximum number of guest views allowed
  • Please register below to remove this limitation

Trenazone + Pmag ...duration?

rdent95

New member
I have one cycle of Hdrol under my belt. Looking to add some lean mass, hopefully drop some BF. I have plenty of trenazone and Pmag which is about to expire. I have some caber just in case, and PCT with Torem, etc lined up, just looking for some input.

Trying to decide on 6 or 8 weeks of trenazone, have 3 bottles of both, and deciding on PMag duration. Was thinking of four weeks of Pmag from the start, or would 5-6 be better?

Was thinking :

Trenazone 1/1.5/1.5/2/2/2 , possibly 2 more weeks
Pmag 50/75/75/75 , or longer?
Cycle Assist all the way through
UDCA all the way through

PCT is
Torem 120-90/60/60/30
DAA weeks 1-4
PCT Assist weeks 1-4
Erase 0/3/3/2/1

Any thoughts or experience with a similar run would be great.......
 
Do it 8 weeks, add some caber, also start erase on week 7-11
Trenazone 1/1.5/1.5/2/2/2/2/2 (8weeks)
Pmag 50/75/75/75/75/75/75/75(8weeks)
 
Thanks for help. Y, I have caber, was going to run it sooner than week 7, .25 twice a week. Forgot to put that in. I will mag Pmag 5 or 6 weeks then, and prob 8 on the Trenazone. Will see how I feel and possibly up the Pmag, prob 100 max though since running both. It's my cherry run stacking.
Also, since I'm trying to lean bulk, my BMR is around 1900. Last cycle I gained a little more than I wanted, a little extra bf due to trying to stuff the calories in. What do you think about running around 2100 cal's/ day, maybe an extra 2-300 on longer cardio days. I pretty much keep a 40p/35c/25f macro diet, and keep stable weight at 1900-2000 cal's. Think that should run good for a lean bulk..??
 
Back
Top