Guest viewing is limited

Jim: Performance is King Log.

Cool stuff with the strongman meet, good work.

Get my package?
 
Lil late, but great job man. Got me wanting to strongman and sh1t.

It's more fun than pure PLing, but also WAY harder.


I think that as a general rule, doing 1 will carryover to the other to some extent (especially at our level). Look for comps in you area man, it's a long ass day, but it's fun.
 
Triple baconator. They always look at me funny when I order a triple baconator, large fries, a large chili, large coke, and large vanilla frosty.
 
1 Double stack down.

This is what you get when you mix your bacon cheeseburger with your double stack.



Invalid Link Removed
 
Invalid Link Removed


If you guys are looking to buy strongman equipment or sleds, this guy sells out of Houston and his prices arent bad. Shipping I'm unsure of because I can just pick it up.

But if anyone's interested, he's a cool guy and the stuff is high quality. He'll fab anything you want to, if you don't see anything you want. Might be cheaperthan alternatives (he makes a prowler for 205, much cheaper than EFS). Site doesn't work yet, I just message him on FB for quotes and info.
 
What the eff are you going to do with a 350lb stone?
 

Attachments

  • image-1514591279.jpg
    image-1514591279.jpg
    15.7 KB · Views: 112
Who even works with the 450lb stone?? Jesus. I don't know what to think of the new book on Juggernaut. It would be nice to have, sure. But what makes it the be-all and end all? Why is it better than all of the other information out there?
 
Who even works with the 450lb stone?? Jesus. I don't know what to think of the new book on Juggernaut. It would be nice to have, sure. But what makes it the be-all and end all? Why is it better than all of the other information out there?

Travis Ortmayer has a 600....

Idk, the gym owner is trying for the 450 I think. He smoked the middleweight at my comp, and is training for Nats currently.

Yeah, I heard Thigpen give a spiel about it at my PL meet. Doesn't seem like anything particularly special to me though.
 
<img src="http://anabolicminds.com/forum/attachment.php?attachmentid=90132"/>

Fill with concrete.

<img src="http://anabolicminds.com/forum/attachment.php?attachmentid=90133"/>

Cover with damp rag to prevent cracking.

So this is like a giant Chia Pet.....
 
Nice. I just offered to make a small one for the kids at the gym. We'll see how it turns out, because next is a 240lber!
 
I was just going to dig a pit in the ground, line it with clay, stick some rebar in there so they poke out halfway, let it get hard, then pour the second half and stick the first half on top. Should be a little cheaper. I like the ol' plaster mold idea, too. How long did it take to make the mold?
 
I was just going to dig a pit in the ground, line it with clay, stick some rebar in there so they poke out halfway, let it get hard, then pour the second half and stick the first half on top. Should be a little cheaper. I like the ol' plaster mold idea, too. How long did it take to make the mold?

An hour or so. Just laid the plaster around a stability ball, deflated the ball and pulled it out the next day.

I thought about doing the hole in the ground too, decided on the plaster mold though. That way it can be one solid piece instead of two, less likely to break.

Edit: deflated the ball the next day and pulled it out. I ended up using just under 3 bags of Plaster of Paris, you could use just 2 for an 18". Just have to find a ball and inflate it to 18" diameter for a 240#.
 
I was just going to dig a pit in the ground, line it with clay, stick some rebar in there so they poke out halfway, let it get hard, then pour the second half and stick the first half on top. Should be a little cheaper. I like the ol' plaster mold idea, too. How long did it take to make the mold?

That ain't gonna work brah, placing the hardened half on top will ruin the non-set bottom.

Have you guise seen my concrete gym?
 
That ain't gonna work brah, placing the hardened half on top will ruin the non-set bottom.

Have you guise seen my concrete gym?

I thought he meant take the two hardened halves and put them together with concrete patcher or something similar.

Concrete gym?
 
That ain't gonna work brah, placing the hardened half on top will ruin the non-set bottom.

Have you guise seen my concrete gym?

You let the bottom get pretty hard before you stick it in there. I'm not doing this myself, my boss has finished more than his fair share of concrete.

What concrete gym?
 
Back
Top