04/28/18
4th - Truck Pull 50ft
Flatbed Semi loaded to ~35k lbs - 24.75 sec
4th - Frame Hold Big Free-spinning handles
350 25 seconds
Tie for 5th - 10” Logpress
200x4 PR
2nd - Conan’s Wheel
450 43ft
2nd - Stone to Barrels Stationed 10ft apart
225,250,275 in 11.13 seconds
Took 3rd out of 5 in Novice Heavyweight, mid pack. 1 single second faster on truck would have netted me 1st instead of 4th, 1 more second on the hold would have been 3rd, 1 more rep on the little log would have been 4th, 12 ft on Conan’s would have been 1st (it was set too low and it drug on the street and it pulled me fwd despite being easy for me). The 305 stone was literally covered in mud, I absolutely blasted 225-275 up in 11 seconds and then when I was the first to get to 305 it was actually covered in dirt - if the promoter had just wiped it off at all, I would have destroyed it. I snapped it up to midshin easy then all the mud slid off and I was screwed.
I’m happy knowing if I get a hair better on the first 3 events & set my pick height lower I could have won. The stone, that’s on the promoter, but you get what you get! My stone training really paid off, and I think I was the best loader there (only the guy that took 1st loaded the 305 in our class, but he struggled to do it in 38 seconds & I would have did it under 25 for sure, but he got to go after I pulled the dirt off). With only 21 lifters the show flew by in 3.5 hours, but even with very short rests I never felt wore out like I usually do - the circuit work really prepared me well.
Very fun day with a really well-matched group of guys. Had a great time