Thoughts on 8 weeks Osta into bridge of 6-8 weeks LGD?

clown007

clown007

Well-known member
Awards
0
Would this be too long on SARMs?
Should I bridge into a PH instead?

Any ideas or suggestions would be great.

-clown
 
Joedoubledose

Joedoubledose

Well-known member
Awards
0
Seeing how Sarms take about two weeks to kick in I would lap them over and run it for just 12 weeks . Sounds kinda weird but I'd go first 4 weeks osta only then the 5th and start the lgd while taking osta for and then drop the osta at end of week 6 and do solo Lgd for a remaining 4 weeks .
So it'd be like this
Ostarine @20 mg
20/20/20/20/20/20/0/0/0/0/0/0
LGD 4-8mgs
0/0/0/0/4/5/6/7/8/8/8/8
That's what I'd do if I was in your shoes
 
clown007

clown007

Well-known member
Awards
0
Interesting. I hadn't thought about doing it in that way. Thanks Joe
 
yates84

yates84

Well-known member
Awards
2
  • RockStar
  • Established
Seeing how Sarms take about two weeks to kick in I would lap them over and run it for just 12 weeks . Sounds kinda weird but I'd go first 4 weeks osta only then the 5th and start the lgd while taking osta for and then drop the osta at end of week 6 and do solo Lgd for a remaining 4 weeks .
So it'd be like this
Ostarine @20 mg
20/20/20/20/20/20/0/0/0/0/0/0
LGD 4-8mgs
0/0/0/0/4/5/6/7/8/8/8/8
That's what I'd do if I was in your shoes
This looks solid^^^
You going to cut with the osta and lean bulk on the lgd? 12 weeks is probably the longest you want to run this imo
 
Joedoubledose

Joedoubledose

Well-known member
Awards
0
Just a thought , it seems like it'd work pretty nice I may actually try this layout in the future
 
mountainman33

mountainman33

Well-known member
Awards
2
  • RockStar
  • Established
Ostarine @20 mg
20/20/20/20/20/20/0/0/0/0/0/0
LGD 4-8mgs
0/0/0/0/4/5/6/7/8/8/8/8
That's what I'd do if I was in your shoes
This is the best way to do it IMO.
 

thu_hobbit

Active member
Awards
1
  • Established
i have the same stuff but was wanting to maybe throw some mk677 in with it simultaneously...any thoughts on how i would do this?

also, would it hurt to run the osto a 1-2 weeks longer into the cycle?
 

1kerry

Active member
Awards
0
This looks solid^^^
You going to cut with the osta and lean bulk on the lgd? 12 weeks is probably the longest you want to run this imo
Sir, how about osta for 12 weeks solo?
 
yates84

yates84

Well-known member
Awards
2
  • RockStar
  • Established

Similar threads


Top