I just ran my first cycle of Test E for 14 weeks. I'm currently trying to decide what my next cycle is going to be. My main concern is being able to go time on =time off and fit a cutting cycle in before the end of next summer (cycle 3). I plan on running a 14 week cycle. The beggining of my cycle i plan on it being a straight bulker, then clean up towards the end for more of a lean bulker.
cycle 1
test E weeks 1-12
Eq weeks 1-10 or 11 with a 2 week front load.
1 Test 3-12
prop weeks 1-2\13-14
Im also considering using prop for the last 4 weeks and cutting the enthane off at 10 weeks.
Cycle 2
Test E weeks 1-12
1 test weeks 1-10
Tren weeks 8-14
I might also use prop with this.
Also i have superdrol and m1t that i plan on using somewhere, i want to figure out the inj first though.
cycle 1
test E weeks 1-12
Eq weeks 1-10 or 11 with a 2 week front load.
1 Test 3-12
prop weeks 1-2\13-14
Im also considering using prop for the last 4 weeks and cutting the enthane off at 10 weeks.
Cycle 2
Test E weeks 1-12
1 test weeks 1-10
Tren weeks 8-14
I might also use prop with this.
Also i have superdrol and m1t that i plan on using somewhere, i want to figure out the inj first though.