Masciaman
Active member
- Awards
- 0
ok to start off i dont need someone telling me how this is SUPPOSED to be done because I know. And I know there are risks in what i am about to propose but I want to hear if it can be done without like PERM problems..
K well I just came off a 6 week long Epi cycle and finished my serm/daa/erase PCT. The question here is I have everything for a 4 week mdrol cycle which includes the following:
M-stane
N2guard
Liver support
Fish Oil
RS-Transaderm
PCT:
Liquid Nolva
DAA
Erase
do you think i can pull this off so close to my finished epi cycle?(I would start in 2 weeks so I can preload liver support and the trans) I was going to run it at 20/20/20/20. So pretty much itd be like taking around 6 weeks off instead of 10 weeks if you do the whole time youre on + PCT = time off.. Like I said I just want to hear thoughts but dont post anything at all if youre just going to basically criticize the entire post..
Thanks
K well I just came off a 6 week long Epi cycle and finished my serm/daa/erase PCT. The question here is I have everything for a 4 week mdrol cycle which includes the following:
M-stane
N2guard
Liver support
Fish Oil
RS-Transaderm
PCT:
Liquid Nolva
DAA
Erase
do you think i can pull this off so close to my finished epi cycle?(I would start in 2 weeks so I can preload liver support and the trans) I was going to run it at 20/20/20/20. So pretty much itd be like taking around 6 weeks off instead of 10 weeks if you do the whole time youre on + PCT = time off.. Like I said I just want to hear thoughts but dont post anything at all if youre just going to basically criticize the entire post..
Thanks